Introducing a scheme of this size takes a large amount of planning. We began by trialling the scheme in our pilot areas in South and East Bristol. Following the success in those areas, in July 2012 it was agreed to propose that the lower speed limit would be rolled out city wide. Work on the planning began immediately and the proposed roll out is proposed to be completed by March 2015.